YAS WATERWORLD ABU DHABI PHASE 1, YAS ISLAND, ABU DHABI
Contributed to the expansion of Yas Water World, a premier water park in Abu Dhabi, featuring new slides, lagoons, rides, and themed structures.
Scope included demolition, masonry, waterproofing, cladding, finishes, woodworks, and FF&E installation.
YAS Water World Expansion – Phase 2, YAS ISLAND, ABU DHABI
Participated in the expansion of Yas Water World, enhancing the park with new rides, water features, dining areas, and themed attractions.
Scope covered demolition, masonry, waterproofing, cladding, interior finishes, woodworks, and FF&E execution.
FERRARI WORLD E-SPORTS ARENA, YAS ISLAND, ABU DHABI
Led the transformation of Ferrari World’s Scuderia Challenge into a cutting-edge E-Sports Arena, overseeing design development, coordination, and full construction execution.
Scope included architecture, interiors, MEP, AV systems, simulators, specialist lighting, and turnkey delivery of all finishes, signage, and media components.
MOBILITY PAVILION, EXPO 2020, DUBAI
IDC executed the Ceilings, Partitions, and Painting package for the Mobility Pavilion at Expo 2020, including installation of fire-rated, acoustic, and moisture-resistant gypsum systems.
Scope covered bulkheads, trims, insulation, access panels, and full compliance with Dubai Municipality (DM) and Dubai Civil Defense (DCD) requirements.
CONFERENCE & EXHIBITION CENTER CAMPUS, EXPO 2020, DUBAI
IDC was responsible for the complete supply and installation of gypsum and metal ceilings, partitions, and associated works at the 45,000 m² CoEx Campus, Dubai Expo 2020.
The scope included fire and acoustic rated systems, vapor barriers, trims, insulation, and full compliance with DM and DCD standards.
JUMEIRAH GATE – THE ADDRESS HOTEL & RESIDENCES, JUMEIRAH BEACH, DUBAI
Executed the supply and installation of false ceilings, partitions, and final paint finish across the Residential Tower of The Address Jumeirah Gate in Dubai.
Scope also included thermal and acoustic soffit insulation throughout basement carparks of this iconic 77-story beachfront twin-tower development.
SKY VENTURE (NEW ENTRANCE MARQUEE AT CLYMB, YAS ISLAND, ABU DHABI
Executed the detailed design, engineering, manufacture, supply, and installation of the Entrance Marquee works for CLYMB Abu Dhabi, a premier indoor adventure destination.
The facility features the world’s largest indoor skydiving chamber and the region’s tallest indoor climbing wall, setting global records in adventure sports.
KSA PAVILION, EXPO CITY, DUBAI
Delivered engineering, coordination, and installation of gypsum false ceilings and partitions for the 13,059 sqm Saudi Pavilion at Expo 2020 Dubai.
Showcasing Saudi’s people, nature, heritage, and future, the LEED Platinum Certified pavilion featured immersive, artist-led experiences and innovative day-to-night transformations.
ADNOC GROUP SERVICES HUB, AL DHAFRAH, ABU DHABI
Executed interior works for a 55,000+ m² Industrial Services Hub featuring warehouses, a lab, and sample library.
Scope included supply and installation of FR & Non-FR suspended ceilings and gypsum wall partitions per project specifications.
CENTRE OF CURIOSITY, SAADIYAT ISLAND, ABU DHABI
Delivered the full fit-out works for the Centre of Curiosity on Saadiyat Island, a cutting-edge digital exhibit space blending art, nature, and immersive technology.
Scope included design, engineering, BIM coordination, and execution of structural steel, finishes, partitions, theming, and exhibit integration elements.

JUMEIRAH GATE – THE ADDRESS HOTEL & RESIDENCES, JUMEIRAH BEACH, DUBAI
The Address Jumeirah Gate is a twin 77-story tower in JBR, featuring a five-star hotel, serviced apartments, and residences, with the world’s tallest infinity rooftop pool. IDC’s scope includes the supply and installation of false ceilings, partitions, final paint finishes, and thermal & acoustic soffit insulation

ONE ZA’ABEEL, DUBAI
Delivered specialized ceiling and partition works for One Za’abeel, a landmark mixed-use development featuring residential, commercial, and hospitality spaces in central Dubai.
Scope included installation of gypsum, metal, acoustic, and decorative ceilings, partitions, insulation, bulkheads, access panels, and advanced suspension systems.

SEAWORLD, YAS ISLAND, ABU DHABI
SeaWorld Abu Dhabi is the UAE’s first marine life theme park, featuring six themed zones, over 100 animal experiences, and 35 interactive attractions. IDC’s scope includes specialty ceilings, partitions, acoustic wall linings, insulation, and painting works across the main and external buildings.

Healthpoint Hospital
Healthpoint Hospital is a multi-specialty healthcare facility in Abu Dhabi, housing advanced medical centers and diagnostic services. IDC’s scope included drywall partitions, lead lining, and various suspended ceilings, including acoustic, fire-rated, and external ceilings, contributing to the LEED Silver-certified project.

Dubai Mall Zaabeel Extension Project- Link Bridge
The Dubai Mall Zabeel Expansion (TDMZE) is an expansion to the existing Dubai Mall which will increase the footprint of the mall by 40%

SHEIKH SHAKHBOUT MEDICAL CITY
The new Sheikh Shakhbout Medical City (formerly Al Mafraq Hospital) is a 6oo$m (2.2b UAE Dirhams) project located in Al Mafraq, Abu Dhabi. Upon completion, the -739bed general hospital will be one of the leading trauma/surgery hospitals in the area.

DUBAI PARKS & RESORTS – MOTIONGATE
Motiongate Dubai is a 1.9 million-square foot park that is part of Dubai Parks & Resorts, the Middle East's largest theme park that is planned to be over
25 square kilometres, that sits just off Sheikh Zayed Road between Abu Dhabi and Dubai.

FERRARI WORLD ABU DHABI – PHASE 2 (YAS ISLAND)
Ferrari World Abu Dhabi is an amusement park on Yas Island in Abu Dhabi, United Arab Emirates covering 86,ooo sqm. It is the first Ferrari-branded theme park and has the record for the largest space frame structure ever built.

WARNER BROS WORLD THEME PARK (YAS ISLAND)
Set to open in 2018 on Yas Island, Warner Bros. World™ Abu Dhabi will feature six immersive lands: Metropolis and Gotham City, inspired by the universe of DC Super Heroes and Super Villains

MIDFIELD TERMINAL BUILDING (ABU DHABI INTERNATIONAL AIRPORT)
MTB is an ongoing project, which is expected to go live in the 2nd quarter of 2019. It is being constructed by a joint venture between Consolidated Contractors Company (CCC), TAVand Arabtec (TCA-joint venture)